| Electronic Components Datasheet Search |
|
UBX-15025193-R05 Datasheet(PDF) 13 Page - u-blox AG |
|
|
|||||||||||||||||||||||||||||
UBX-15025193-R05 Datasheet(HTML) 13 Page - u-blox AG |
|
13 / 36 page ![]() NEO/LEA-M8T - Data sheet UBX-15025193 - R05 Functional description Page 13 of 36 Production Information uncertainty may include unresolved ambiguities; for example, for GPS these might be epoch (millisecond), bit (20 ms) and sub-frame (6 s). Where the output time-base standard is derived from a different constellation (for example, GPS-time from GLONASS), the estimate of uncertainty includes inter-constellation offset uncertainties. The estimate of uncertainty is used to disable or modify the time-pulse output by comparison with the “tAcc” parameter (after conversion to distance) configured in message CFG-NAV5. Multi-GNSS signal reception: Particularly where sky views are limited, the timing accuracy is improved by combining measurements from two constellations. Inter-GNSS timing offsets are derived locally by the receiver whenever a timing fix can be achieved independently from each constellation (locally derived offsets automatically account for antenna, filter and cable dispersion). These offsets are then used for subsequent combined fixes. Where inter-GNSS offsets cannot be derived locally, offsets broadcast by the constellation satellites are used where available. Fix redundancy (RAIM): The receiver automatically and continually adjusts the significance of individual signal measurements in the reported estimate of time according to its quality and consistency. This ensures that the integrity of the reported time is protected from individual faulty signals or measurements so long as there are more signals in use than the minimum required. The minimum number changes depending on the situation but whenever it is exceeded “RAIM active” is set in message TIM-TP to indicate that this protection is active. Aiding: While a GNSS receiver may be able to achieve a vernier (sub-microsecond) time-fix even under poor signal conditions, it may be slow or unable to resolve higher order ambiguities (especially whole milliseconds for GPS). Sub-millisecond time aiding may be applied to u-blox NEO-M8T and LEA- M8T modules by means of a pulse to one of the EXTINT pins in conjunction with a MGA-INI-TIME message, enabling immediate resolution of ambiguities as well as accelerating time to fix. 1.8.5 Raw data The NEO/LEA-M8T modules provide raw measurement data for civil L1 band GPS, GLONASS and BeiDou signals including pseudo-range and carrier phase, Doppler and message payloads. The data contained in the RXM-RAWX message follows the conventions of a multi-GNSS RINEX 3 observation file and includes pseudo-range, carrier phase and Doppler measurements along with measurement quality data. The RXM-SFRBX message provides the demodulated, parity-checked navigation and signaling message bits for each satellite currently tracked by the receiver including GPS, GLONASS and BeiDou constellations, SBAS satellites, the QZSS L1S signal and IMES beacons. Raw measurement data are available once the receiver has established data bit synchronization and time-of-week. Message data are available for all signals tracked at a sufficient level to achieve data bit and frame synchronization. For more information, see the u-blox 8 / M8 Receiver Description including Protocol Specification [3]. 1.8.6 Low duty-cycle operation The NEO-M8T and LEA-M8T low-power timing modules support energy-saving automatic on/off interval low duty-cycle operation in conjunction with their precision timing features. On/off low duty- cycle operation is enabled with the power save mode setting in message CFG-RXM and on/off mode in message CFG-PM2. Through a set of period and time-out parameters defined in the CFG-PM2 message the receiver can be configured to deliver a new time fix at intervals with a limit on total energy consumed for searches if no fix can be achieved. Note that the time-pulse output is not available while the receiver is in the “off” section of each cycle. The duty-cycle of operation may be reduced significantly by: provision of sub-millisecond time-aiding to accelerate ambiguity resolution (see 1.8.4 above), |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |