| Electronic Components Datasheet Search |
|
082-8003-404 Datasheet(PDF) 7 Page - Magnetrol International, Inc. |
|
|
|||||||||||||||||||||||||||||
082-8003-404 Datasheet(HTML) 7 Page - Magnetrol International, Inc. |
|
7 / 24 page ![]() 50-613 Kotron Series 82 CE RF Level Transmitter 4 2. Install the transmitter housing using the bracket (supplied by Magnetrol). Make sure to provide adequate clearance to remove the housing cover. Refer to Figure 3 on page 3. 3. Remove the transmitter housing cover. Connect the posi- tive lead of the interconnection cable to the (+) probe terminal. Connect the negative lead and shield to the (–) probe terminal. Refer to Figure 3 on page 3. 4. Proceed to Wiring, Section 1.6. 1.5.2 Flexible Probe Caution: Flexible probes are shipped with the cable clamp and the packing gland nut hand tightened to permit length adjust- ment in the field. The cable clamp and packing gland nut must be tightened before use. The end of a flexible probe MUST be kept taut by attaching the anchor end at the bottom of the vessel or by using a Magnetrol supplied probe weight. Caution: Do not discard the Mylar housing insulator. Caution: The probe cable must not be in contact with any metallic surface in its final installation position. 1. Attach the weight or anchor assembly to the end of the probe. Insert the probe through the vessel’s mounting con- nection and feed the cable into the vessel. Do not allow the probe to scrape against the connection threads. 2. Secure the anchor assembly (if used) to the bottom of the vessel. 3. Apply thread sealant to the mounting nut. Screw the mounting nut into the mounting connection until tight. 4. Remove the Mylar housing insulator located over the clamp. DO NOT DISCARD. Refer to Figure 4. 5. Loosen both socket head screws from the clamp. Pull the clamp and Teflon retaining bushing off of the probe. 6. While holding on to the probe cable, loosen the upper packing gland nut. DO NOT ALLOW THE PROBE CABLE TO FALL INTO THE VESSEL. 7. Pull the excess cable up through the packing gland nut until the cable is taut. Tighten the packing gland nut. 8. Cut the cable 1.35 inches (34mm) above the packing gland nut and strip off 1.25 inches (32mm) of insulation. 9. Slide the Teflon retaining bushing onto the cable and seat it into the packing gland nut. Slide the clamp onto the cable and seat it against the Teflon retaining bushing. Probe Terminal Transmitter Housing Probe Housing Shielded Twisted Pair Probe Connection Screw Packing Gland Nut Conduit Supplied By User Rigid or Flexible Probe Conduit connection Shielded Twisted Pair Mounting Bracket Figure 4 Side View Remote Mount Models w/Rigid or Flexible Probe ECTFE Flexible Probe MYLAR INSULATOR PROBE WIRE SCREW CLAMP SET SCREW SEAL FLARE 3/8 16 UNC 2B PROBE CABLE CLAMP RETAINING BUSHING UPPER MOUNTING NUT HALF LOWER MOUNTING NUT HALF |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |