| Electronic Components Datasheet Search |
|
QS20.241 Datasheet(PDF) 21 Page - PULS GmbH |
|
|
|||||||||||||||||||||||||||||
QS20.241 Datasheet(HTML) 21 Page - PULS GmbH |
|
21 / 26 page ![]() QS20.241, QS20.241-A1, QS20.241-C1 Q-Series 24V, 20A, SINGLE PHASE INPUT 22. APPLICATION NOTES 22.1. REPETITIVE PULSE LOADING Typically, a load current is not constant and varies over time. This power supply is designed to support loads with a higher short-term power demand (=BonusPower®). The short-term duration is hardware controlled by an output power manager and is available on a repeated basis. If the BonusPower® load lasts longer than the hardware controller allows it, the output voltage will dip and the next BonusPower® is available after the BonusPower® recovery time (see chapter 6) has elapsed. To avoid this, the following rules must be met: a) The power demand of the pulse must be below 150% of the nominal output power. b) The duration of the pulse power must be shorter than the allowed BonusPower® time. (see output section) c) The average (R.M.S.) output current must be below the specified continuous output current. If the R.M.S. current is higher, the unit will respond with a thermal shut-down after a period of time. Use the maximum duty cycle curve (Fig. 22-2) to check if the average output current is below the nominal current. Fig. 22-1 Repetitive pulse loads, definitions Fig. 22-2 Max. duty cycle curve 100% P PEAK T PEAK P 0 T 0 max. 150% 150% 100 0 0.2 0.4 0.6 0.8 1.0 DutyCycle 110 120 130 140 P PEAK P 0 = 10% P 0 = 50% P 0 = 75% P 0 = 100% P0 Base load (W) PPEAK Pulse load (above 100%) T0 Duration between pulses (s) TPEAK Pulse duration (s) DutyCycle T 0 = Tpeak - (DutyCycle x Tpeak) Tpeak + T0 Tpeak DutyCycle = Example: A load is powered continuously with 240W (= 50% of the rated output load). From time to time a peak power of 720W (= 150% of the rated output load) is needed for 1 second. The question is: How often can this pulse be supplied without overloading the power supply? - Make a vertical line at PPEAK = 150% and a horizontal line where the vertical line crosses the P0 = 50% curve. Read the max. duty cycle from the duty cycle-axis (= 0.37) - Calculate the required pause (base load) length T0: 21/26 - Result: The required pause length = 1.7s - Max. repetition rate = pulse +pause length = 2.7s More examples for pulse load compatibility: PPEAK P0 TPEAK T0 PPEAK P0 TPEAK T0 720W 480W 1s >25s 720W 240W 0.1s >0.16s 720W 0W 1s >1.3s 720W 240W 1s >1.6s 600W 240W 1s > 0.75s 720W 240W 3s >4.9s DutyCycle T 0= Tpeak - (DutyCycle x Tpeak) 0.37 1s - (0.37 x 1s) == 1.7s Oct. 2013 / Rev. 2.2 DS-QS20.241-EN All parameters are specified at 24V, 20A, 230Vac, 25°C ambient and after a 5 minutes run-in time unless otherwise noted. www.pulspower.com Phone +49 89 9278 0 Germany |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |