| Electronic Components Datasheet Search |
|
SE2623L-R-EK1 Datasheet(PDF) 6 Page - Skyworks Solutions Inc. |
|
|
|||||||||||||||||||||||||||||
SE2623L-R-EK1 Datasheet(HTML) 6 Page - Skyworks Solutions Inc. |
|
6 / 12 page ![]() DATA SHEET • SE2623L-R: 2.4 GHz HIGH POWER WIRELESS LAN POWER AMPLIFIER Skyworks Solutions, Inc. • Phone [781] 376-3000 • Fax [781] 376-3100 • sales@skyworksinc.com • www.skyworksinc.com 6 February 11, 2020 • Skyworks Proprietary Information • Products and Product Information are Subject to Change Without Notice • 202397J 1 2 3 4 9 10 12 11 6 78 5 J2 SMA 12345 6 VCC0 C43 100 pF C4 4.7 μF C10 DNI C8 DNI R2 47 Ω R9 10 Ω R5 0 Ω C7 100 nF C15 DNI R1 0 Ω R6 DNI R3 DNI C5 470 nF C1 3.3 pF C2 2.4 pF C6 15 pF C3 2.4 pF C13 1.5 pF L1 1.0 nH C9 DNI C14 100 nF RF_IN EN GND VCC0 GND RF_OUT RF_OUT GND C12 100 nF C11 DNI 15 14 13 16 17 R8 0 Ω R4 0 Ω 7 R7 26.1K J3 J4 J1 SMA VCC0 EN Y0742 12345 6 7 C1 should have one pad on T1 and should be placed 0.7 mm from the edge of U1. C1 is grounded on the same side as Pin 12 of U1. C2 Should be placed 0.95 mm from the edge of U1 and grounded on the same side as pin 9 of U1. T2 is 1 mm long and is measured from the edge of T1 to the inside edge of the C2 pad. R1 should have one pad on T1 and should be placed 1.65 mm from the edge of U1. R1 should be placed next to C1 and moved away from C2 such that the pad does not interfere with T2. T1 is 2.85 mm long and is measured from the edge of U1 to the inside edge of the C6 pad. T4 is 1.5 mm long and is measured from the inside edge of the C6 pad to the inside edge of the L1 pad. C3 is placed such that it is grounded on the same side as pin 9 of U1. T3 is 1 mm long, starts at the C6 pad and is measured from the edge of T4 to the inside edge of the C3 pad. T6 is 0.5 mm wide, 5.2 mm long and is measured from the center of the R1 pad to the center of the C14 pad. T1, T2, T3, T4, and T5 are all 50 ΩTX lines. The components on the output need to follow the placement and layout of the Evaluation Board. Notes on location and dimension of critical elements: T5 T3 T4 T2 T1 T6 Figure 4. SE2623L-R Evaluation Board Schematic Diagram |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |