| Electronic Components Datasheet Search |
|
XC9504B092DAL Datasheet(PDF) 11 Page - Torex Semiconductor |
|
|
|||||||||||||||||||||||||||||
XC9504B092DAL Datasheet(HTML) 11 Page - Torex Semiconductor |
|
11 / 53 page ![]() 11/53 XC9504 Series ■NOTES ON USE (Continued) ●Hint on application 1. Channel 1 (Step-Up) How to shut down the output voltage during standby mode If the circuit configuration shown as an example of typical application circuits is used, voltage VIN will occur at VOUT1 when the IC is in standby, the diode being bypassed. This can cause circuits connected to VOUT1 to malfunction. > Example of typical application circuit 1: Set R1 so as to prevent leakage current of N-ch MOSFET 2. > Example of typical application circuit 2: Power Ready Function The combination of R 2, C 1, and the threshold voltage of approximately 0.7 V of NPN Bip 1 is used to produce a delay time between the circuits being enabled and P-ch MOSFET 1 being switched on. Delay time set to 20ms ensures power to be made ready in a favorable manner, as soft start of this product is completed during the delay time. Set Value (Example) VOLTAGE (V) R2 (kΩ) C1 (μF) 2.5 430 0.15 3.3 470 0.18 5.0 430 0.33 Time to make power ready is calculated by the equation below. Time = - R2 x C1 x Ln (1 - 0.7 / [ON / OFF Signal Voltage ] Set R1 so as to prevent leakage current of NPN (Bip 1). N-ch MOSFET 2 and the inverter enables power to be turned off quickly. 2. Channel 2 (Inverting): Soft start circuit Channel 2 (inverting) is subject to the overshoot of output voltage 2 (VOUT2) at start-up. It is possible to control the overshoot of output voltage 2 (VOUT2), as shown by circuit example 1 in “Output Voltage Settings for Channel 2” in “Function Settings.” In this circuit configuration, EN 1 and EN 2 are enabled (set to “H” level) simultaneously. This lets output voltage 1 (VOUT1) of channel 1 increase gently as soft start, thereby controlling the overshoot. > Example of typical application circuit: Improved Soft start This example is effective when EN 1 and EN 2 are enabled with different timings under light load condition (the coil current being discontinuous). VOUT1 SBD1 FB1 EN1 Pch MOSFET1 Inside of XC9504 IC RFB11 RFB12 CL1 CFB1 Nch MOSFET2 ON/OFF signal R1 VOUT1 SBD1 FB1 EN1 Pch MOSFET1 RFB11 RFB12 CFB1 CL1 R1 R2 C1 NPN Bip1 Nch MOSFET2 Inside of XC9504 IC ON/OFF signal SBD2 VOUT1 FB2 Inside of XC9504 IC RFB21 CFB21 VOUT2 CL2 RFB22 EN2 ON/OFF signal Pch MOSFET1 R1 Nch MOSFET2 Time to make soft start time is calculated by the equation below. Timess2 = -RFB21 × CFB21 / Ln 1 – Example) When VOUT1 = 15V and VOUT2 = - 7.5V, RFB21 = 59.6k Ω, RFB22 = 100kΩ by the equation below. VOUT2 = (0.9 - VOUT1) x (RFB21 / RFB22) + 0.9 When the light load, CFB21=0.1 μF or lower value can be used. Therefore, when CFB21=0.027 μF, Time_ss2 = 5.0ms and VOUT2 = 95% of setting value (0.9-VOUT2) ×RFB22) (VOUT1 – 0.9) ×RFB21) 3. Channel 2 (Inverting): Withstand voltage of transistor The voltage applied between the drain and source is the sum of VIN and VOUT2. Select a transistor with an absolute VDSS rating that is suitable for your operating conditions. Example: The voltage applied across VDS of a transistor will be 20.0V if VIN = 5.0 V and VOUT2 = -15.0 V. Under this condition, a transistor with VDSS higher than 20.0V should be selected. (Use a transistor with VDSS that is 1.5 times the applied voltage or more, as a standard.) |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |