| Electronic Components Datasheet Search |
|
822-1002-C01 Datasheet(PDF) 27 Page - Magnetrol International, Inc. |
|
|
|||||||||||||||||||||||||||||
822-1002-C01 Datasheet(HTML) 27 Page - Magnetrol International, Inc. |
|
27 / 40 page ![]() 50-621 Kotron Sentinel Models 822, 832 and 842 RF Point Level Switches 24 2.5 Advanced Calibration Use these procedures in conjunction with standard calibra- tion procedures already observed. 2.5.1 Calibration with No Level Change 1. Single Point: Accomplished in Section 2.3.2, Program Path 2 — Single Point procedure. 2.5.2 Tank Commissioning Initial calibration in water (conductive medium) with final use in a non-conducive medium. If final medium is also conductive, no calibration change is necessary 2.5.2.1 Single Point 1. Water (commissioning medium): Follow standard calibra- tion procedure. 2. Final Process Medium (non-conductive): In Single Point program, change MDIA (media) from COND (conductive) to NONC (non-conductive) 2.5.2.2 Multi-Point NOTE: Proper probe choice is critical. If final medium is conductive (i.e., dielectric is >10 or conductivity is >10 micro mho/cm), any insulated probe may be utilized. If final medium is non- conductive (i.e., dielectric is <10 or conductivity is <10 micro mho/cm), an insulated stilling well probe must be utilized (models 8XA-XAXB-XXX or 8XB-AAXB-XXX). 1. Water a. Establish PRLO point (refer to Section 2.4.2, Program Path 3 – Probe Calibration). With probe installed and NO liquid in the vessel, enter PRLO point. This value should equal the distance of the tip of the probe from the bottom of the vessel, plus one inch. b. Establish PRHI point (refer to Section 2.4.2, Program Path 3 – Probe Calibration). Raise level of the commis- sioning liquid (usually water) to the highest point possible. Enter PRHI point. c. Complete relay calibration (refer to Section 2.4.2, Program Path 3 – Probe Calibration). 2. Final Process Medium With commissioning liquid removed and final process medium in the vessel, reestablish PRHI point (for best results at least 25% of the probe should be immersed). Relay control parameters are now calibrated to the new process medium. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |